Saturday, October 10, 2009

Z6 Condo construction continues



The Z6 residential four-floor condo is underway on Booth Street at Balsam, albeit very slowly. The foundation has been excavated for a single-floor underground parking garage. The square pool is probably the elevator pit.

It is interesting how often it is the toilet that is installed first. Occupancy (for the condos) is anticipated for 2010.

No comments:

Post a Comment