Tuesday, July 27, 2010
Animating LeBreton Flats streets
The picture above is a new condo door installed by Claridge on its ground floor condos on Lett Street (LeBreton Flats, under the yellow tower).
It is highly significant.
City and NCC plans for the development call for animated streets, full of people walking, playing, shopping ... but the first phase building as regular sliding doors on all ground floor units. You know, patio doors. No lock nor key to access them from the outside. No lobby space inside those doors, just step straight into the living room. In short, the developer paid lip service to the notion of animated streets but built the opposite.
The second phase of the first building faces Lett and Fleet Streets. The ground floor units (mostly) have hinged glass doors. With exterior handles. And locks. So someone can actually come and go at street level.
It is an improvement.
Monday, June 28, 2010
383 Albert, transit oriented parking requirements
The pictures above show the Claridge proposal for three residential (condo) towers in downtown Ottawa. As noted in a post a few days ago, they are to be built on the lot between the Crowne Plaza Hotel and 151 Bay condos. The current parking lot location abuts Barabarella's dancing establishment, which will remain after this project is built.
The two 28 storey and one 22 storey towers will have approx 481 apartments. They are located directly above the proposed west downtown LRT station which is under Albert Street. Perhaps those delighted looking ladies in the photomontage just exited the LRT and are headed towards Minto Place ...
The city rationalizes a big part of its LRT expenditure on intensified infill development around the stations. As part of this intense Transit-Oriented-Development (TOD) the plans call for high density and reduced parking.
Claridge is proposing to provide 365 residential parking spaces (365spaces/481units=75% parking). This is less than what developers usually provide for condos, for eg along Richmond Road, West Wellie, or Champagne Avenue they provide 113% (1.13spaces per unit). Better developers provide reserved prime spots for VirtuCar since each VirtuCar satisfies approximately 17 households, ie eliminates 17 parking stalls which cost developers approx $30k each to build (several developers I talked to said the 30k cost/price is cost recovery). Claridge is also providing 241 bike parking spaces (50%) which I suspect is way too low.
So what does the City of Ottawa require as the MAXIMUM number of spaces the developer can provide for this Transit Oriented Development, so as to encourage people to walk and use transit?? Why ... the maximum number of spaces within 600m of a transit station is ... wait for it ... 722 spaces, or 150% parking. Think about that: the city's maximum number of spaces to encourage transit usage is HIGHER than developers want to provide or normally provide either in the downtown core or inner suburbs. Is our TOD policy as farcical as it looks? Makes me wonder what other marvellous things are in that policy.
Thursday, June 24, 2010
Condo Development linked to LRT ? Will Claridge "play ball"?
The Downtown Ottawa transit tunnel (DOTT) project for our underground LRT system will run under Albert Street (the right side of the above picture) beside the largely vacant lot. To the right, just off the edge of the picture, is the Cs Co-Op lot, which is proposed to become the site of a large new Library building. The western portion of the downtown will be served by a underground LRT station. The station would have two entrances:
- one to the east end of the station platforms, coming up beside the fountain in front of Place de Ville, serving the downtown office buildings; and
- one entrance from the west end of the platform, coming up through the Library building, and serving the concentration of residential high rises there.
Wednesday, March 17, 2010
Archways
Tuesday, February 2, 2010
Courtyard in Condo
Monday, February 1, 2010
LeBreton Flats Condo grows
Friday, November 27, 2009
West Wellington Condo Mania
The building will have vehicular access from the side facing the Loeb/Metro store.
The building exterior is very much in the same style as the building at 200 Lett Street at the corner of Wellington, the first condo built in the current LeBreton Flats project. While it doesn't have a glass tower on top of a podium, both are similar heights (six and seven stories), have windows that vary vertically and horizontally in size, shape, and position. Both have decorative horizontal reliefs or cut ins.
It remains to be seen if this building, already in a built-up area, will be better received than the LeBreton building.
The Claridge condo on the Flats is much larger than 1433 Wellington. However, a similar sized and designed building to the one pictured above(same architect, same builder) is planned for right next door in West Wellington (the car audio site), so from the street there will be much more building than looking at "phase 1" might suggest. The two West Wellington buildings as currently planned will be separated by the 3 storey Bella Bistro restuarant.
Wednesday, November 25, 2009
LeBreton Flats condo grows
The new building will be a seven storey podium of yellow brick, with a tower on the east side going to 14 floors, with an exterior of yellow brick and glass (same glass as first tower, but second tower will read as mostly brick).
The architecture or style of this building is spreading. Two new condos on West Wellington near Island Park are similar style to the LeBreton podiums.
Sunday, September 6, 2009
Blinding Urban Development
Sunday, August 23, 2009
200 Lett St condo by Claridge
Wednesday, August 19, 2009
Contrary results ...
NCC path (foreground); City path beyond
what will the yellow line do?
There must be a law or maxim somewhere that the more planning is done, the more expensive the administration, the worse the results.
-
A few blogs ago I lamented the apparent mismatch between the NCC section of the bikepath from new Wellington that goes south along the aquaduct behind the new Claridge condo at 200 Lett Street in LeBreton Flats.
-
I still cannot believe that despite all the planners, all the coordination, the high city taxes ... that the City-spec'd path is two feet narrower than the NCC path it continues.
-
I remain curious as to what the yellow line will do ... jog to the centre of the city section? continue straight on leaving one lane wider than the other? Or maybe the city won't have a yellow line, because their path isn't a bike path, its a pedestrian only path?
Edit: 25 August 2009: as noted in the comments, it is an illusion that the NCC path is wider than the City path. Both measure the same with a tape measure at several points along the paths. However, there is a side path joining the NCC path just a few feet north of the switchover to City path, and the problem lies at the junction. Basically, the NCC contractor did not build a proper radius or curve on the side path and it joins the NCC path rather sloppily, leaving only the few feet from the where the paths join to the joint with the City path being too wide by about a foot. The correct solution is to trim the NCC path back for about 10' on its radius so it blends into the main path better. So, the City and NCC are coordinating their paths correctly. Whew.
-Eric Darwin
Thursday, August 13, 2009
How Wide is a Bike Path ?
in May, NCC path is laid, looking south from Wellington
in August, Claridge lays path behind 200 Lett St condo
Now Claridge may not be the fastest developer in town, but he is finally implementing the landscaping around the 200 Lett Street yellow-brick condo tower on LeBreton Flats. The path behind the condo, along the tailrace/aquaduct, is being laid and connected to the NCC path. The path is laid to City of Ottawa standards, as spec'd to Claridge in the subdivision agreement.
Look at the not-yet-paved gravel path in picture two, which extends the NCC path. Notice that the new path is at least one foot, maybe two feet, narrower than the NCC path. Yup, the NCC apparently builds its paths to a more generous standard than the City, and the two bodies can't quite coordinate when they build different sections of the same path...
Unless ... the NCC built a multipurpose path, which most of us (in)correctly call bike paths, and the city is planning a pedestrian only path ... it wouldn't surprise me if the two layers of government are that far out of sync ... after all, when the City built the path along the north side of Albert from Bronson to Bayview, they paved it a foot or so narrower than their 'official' bike/multipurpose paths, so they won't paint a yellow line down the middle, and have threatened to put "walk your bike" signs on the path. All this, even when they were advised by a number of parties even before the gravel roadbed was put down, that it was too narrow, but apparently four months notice before the asphalt was too late for the city to fix it, so cyclists and pedestrians are stuck with a nebulous "what is it" path that looks like a bike path but maybe is and maybe isn't... when the asphalt goes down on the path along the tailrace, I'll measure it and the NCC path and compare.
Wednesday, August 12, 2009
Pooley's Bridge Re-opens
view from temporary path towards north end of Pooley's Bridge
view north along the temp path towards Wellington
-
Pooley's bridge is an historic stone arch bridge over the aquaduct/tailrace at the foot of Bronson hill. It permits pedestrians and cyclists direct access from the downtown via Commissioner St (that part of "Bronson" that extends downhill north of Albert) to LeBreton Flats. It was renovated and restored a few years ago, for pedestrian and cyclist traffic only, but then was promptly closed when Fleet Street was closed to public access during construction of residences on LeBreton Flats.
-
I have been part of the chorus of people nagging the city and NCC to reopen the bridge, especially since construction of housing by Claridge seems to be going so slowly. My last kick at the cat was to nag the NCC and City in preparation for Bluesfest, since it made a direct and easy access to the site from the downtown.
-
Its too late for Bluesfest, but today I discovered that the extension of the NCC pathway (subject of a number of previous posts ) on the north side of the aquaduct directly behind the new condo tower, is nearing completion. The gravel bed is down, and stakes mark the final asphalt grade. To my surprise, the path does not end at the mid point behind the building, but suddenly narrows to a 6' path that skirts the construction fences and opens to the north end of Pooley's bridge, which is once again open for traffic.
-
Within a few days, it should be paved, and this valuable link will be open again. Note that cyclists and walkers will not directly access Fleet St from the north end of the bridge, but will skirt around the yellow condo at 200 Lett St and be delivered either to Lett St a few meters north of Fleet, or directly to new Wellington Street.
Tuesday, July 21, 2009
Landscaping resumes at Claridge's Condo
Sunday, July 19, 2009
Smart Construction techniques
Recession Over ?
New housing starts is a good leading indicator of economic confidence. Builders must get their product started a year or more before it is to be occupied.
Wednesday, June 17, 2009
Claridge's Brown-Green Roof
Thursday, May 14, 2009
Bikepath to No-where
The NCC has been landscaping the area north of the Claridge condo building on LeBreton Flats since mid-winter. Earlier posts on this blog showed the winter landscaping and very early spring planting of trees and shrubs. Eventually, the Fallen Firefighters Monument will be constructed on the grassy area.
The contractor (same one as is doing Plouffe Park) has now paved the bike path from Wellington Street north along the west side of the tailrace. A side branch cuts off to the west to join Lett Street beside the condo. But the path goes nowhere, as Claridge hasn't yet landscaped the area between the condo building and the tailrace. The NCC has also seeded the area with grass seed. Light standards are not yet installed. The entire length of the new bike path is shown in the picture above.
This first bit of path bodes well for the future bike and pedestrian pathway that is supposed to eventually continue from here to the end of Pooley's Bridge (ridiculously still closed after an expensive renovation as a essential pedestrian and cycling link) and then west along the aquaduct to Booth and eventually the Ottawa River Parkway where it begins at Vimy Street.
While the plan is good, it will be even better if the path also continues west to service Bayview Station and then eventually joins the Scott St path going to Westboro. But all the investment in the current path sections will be nearly useless if the NCC and City persist in building the path one building lot at a time, with the complete path being usable only when all the Flats are built out in thirty years time. When will we get those nifty aquaduct-side cafes featured on the NCC website?
Kudos to the NCC for building the path, and the quality of the landscaping. Thumbs down on the glacial build-out timeline.
Claridge Green Roof underway
Claridge has finally got going on its green roof for the now-occupied condo on LeBreton Flats. The roof shown is on top of the parking garage, and will be covered with up to 3' of soil on top of the gravel base already laid down. More photos to come as they landscape the roof.
Tuesday, April 28, 2009
LeBreton Landscaping adventures continue
NCC plantings along new bike path, view from Wellington
Claridge doing nothing yet... this is their green roof
NCC plants up to edge of Claridge condo
NCC trees along north edge of condo
In a posting in March, there were photos of the NCC doing winter landscaping on the Flats. They filled in the depression on the north side of the Claridge condo on Lett St, phase 1 of LeBreton Flats north of Albert. They graded the land to a lawn area, roughed in bike/pedestrian paths, and installed a generous trench of topsoil for a row of trees along Wellington. They are now planting in the new areas.
Note that the new bike path goes nowhere. It descends downslope from Wellington, along the west side of the tailrace landscaping. Once it reaches the Claridge zone, it stops dead. Claridge is supposed to continue the path and install landscaping along the public lands between its building and the ravine, as part of its subdivision agreement with the city. There is no sign of Claridge crews. Once they build their section of bike path, it still won't go anywhere until Claridge builds tower 2 of the current building. There is also no sign of Claridge installing its green roof on the parking garage or in the roof top planters.
All this is in marked contrast to the lot to the immediate west of the Claridge condos. It remains a hole that is more evocative of Khandahar than Ottawa. Anyone want to spend half a million buying a condo with a view of an open pit?



