Monday, January 25, 2010

Laying the foundations for Z6 Condo on Booth St



Foundation forming boards still in racks as delivered into the hole by crane. Note the footings are in place around the perimeter, and part of the back concrete wall forms and re-bars have been put in place.




west side




The building will have a round corner facing the Balsam/Booth intersection.




The square elevator base has been poured, with rebar in place to support the elevator shaft walls.